Dry-Docking Repair Works of WB Jamanthy at Yard In Kochi During The Year 2021-22.and IWAI/COCH/MM(66)/2021-22/13
Repair and Maintenance of Kayamkulam IWT Terminal at Ayiramthengu in NW.3. IWAI/COCH/36(9)A/2021-22/12
Construction of Rip – Rap type bank protection in various locations of Cheriyazheekkal area in Kayamkulam – Edappallikkotta stretch of NW.3 and IWAI/COCH/33(3)/2021-22/11
Repair & Maintenance of Kayamkulam IWT Terminal at Ayiramthengu in NW.3 and IWAI/COCH/36(9)A/2021-22/06
Dry Docking Reapir Works of AD Manimala at Yard in Kochi During the Year 2021-22 & IWAI/COCH/MM(46B)/2021-22/10
Construction of Rip – Rap type bank protection in various locations in Champakara & Udyogmandal canals of NW.3 and IWAI/COCH/33(5)B/2021-22/09
Supply of Self-propelled Hopper barge on Hire Basis for Transportation of Dredged Materials in Waterways Under Kochi Regional office & IWAI / COCH / MM (46D) / 2021-22 / 07
Construction of bank protection behind passenger jetty at Kollam terminal in NW.3 and IWAI/COCH/36(11)A/2021-22/08
Dredging at Koramkotta in Udyogmandal of National Waterway.3 Kerala using backhoe dredger
Annual Afloat Repair Works of CSD Champakkara And Anchor Pontoon XI at IWT Maradu Terminal Kochi During The year 2021-22 & IWAI/COCH/MM(65)/2021-22/04