The Servicing, Refilling and Hydraulics pressure test of the FFA items of IWAI Vessels
Construction of 1no. Mooring Facility, Bank Protection Works, Supply of Fenders, and Repair/Renovation of Electrical Works at the Botanical Garden & IWAIko-140TC3/1/2025-Cvl(Kol) dated 23-07-2026
Tender for "Dry-dock repair of SL Ganga for the F.Y.2026-27"
Tender for "Dry-dock repair of CSD Sweta for the F.Y.2026-27"
NIQ for "Supply of Anchor and Shackle at IWAI vessel DB Ajay"
SUPPLY & DEPLOYMENT OF RIVER PILOTS FOR PILOTING OF VESSELS FROM KOLKATA TO TRIBENI STRETCH OF NW-I & IBP ROUTE
NIQ for annual inspection and service of life raft at various vessels under R O Kolkata in the stretch Kahalgoan to Haldia
LIMITED TENDER ENQUIRY (LTE)
NIQ for Afloat repair of FJ Ganga-XIII at Haldia
Operation & Maintenance of Navigational Aids Facilities in between Kolkata-Raichawk /Ghoramara in the Stretch Of NW-1 and at Hemnagar, 24 Pgs(N) in IBP Route of Sunderban Waterways during July 2026 to March 2027.
NIQ for Complete Overhauling of both DG set of AB Dhawalgiri at Kolaghat
Supply, Erection, Operation & Maintenance of Navigational Aids Facilities in between Silvertree point to Athrabaki khal (201 Km) of NW-97 & IWAIKO-12/1/2026-HYD/SUR(KOL)/2026-27
LIMITED TENDER ENQUIRY FOR SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF COPPER ARMOURED CABLES THROUGH MICROTUNNELILING AND FROM WBSEDCL METERING ROOM TO DC CHARGING STATION BESIDE HALDIA TOWNSHIP FERRY GHAT, PURBA MEDINIPUR, WEST BENGAL.
Hydraulic testing & refilling of fire extinguishers installed at various IWAI vessels for the year 2026-27 & IWAI/MM/FFA&LSA/2026-27
Sealed quotations are invited from the reputed Contractor/ repairer/ for repair of the FRP W/H cabin of the vessel SL Meghna at Kolkata & IWAIKo-150MN42/1/2025-DIR(Kol)/261
NIQ for Annual Inspection & refilling/servicing of LSA and FFA items of Tug Ram Prasad Bismil, DB Kalpana Chawla and DB APJ Abdul Kalam
NIQ for Repairing of Vessel ML Bahika at Shantipur Terminal & IWAI/KOL/MM/07/ML Bahika/2025-26
Providing Vessel-Husbanding Services and related activities etc to IWAI vessels in India-Bangladesh PIWTT Riverine Routes
SUPPLY & DEPLOYMENT OF SECURITY PERSONNEL FOR SAFE KEEPING OF IWAI TERMINALS AND OTHER PROPERTIES & IWAI/KOL/8/SECURITY/2025-26
NIT For Supply And Deployment Of Security Personnel For Safe Keeping Of MMT Sahibganj And Other Properties & IWAI/KOL/8/SBG/SECURITY/2025-26
Retender For Annual Repair Of IWAI Vessel CSD ID IV For The Year 2025-26 & IWAI/KOL/MM/49/25-26/CSD ID IV
SUPPLY & DEPLOYMENT OF TECHNICAL AND SUPPORTINGMANPOWER FORIWAI, KOLKATA DURING 2025-26 & IWAI/KOL/8/TECHMANPOWER/25-26
Annual Afloat Repair Of 2 NOS IWAI Vessels Namely CSD Sweta And AD Falgu For The Year 2025-26 & IWAI/KO-150mn14/1/2025-26
Annual Repair Of IWAI Vessel CSD ID IV For The Year 2025-26 & IWAI/KOL/MM/49/25-26/CSD ID IV
NIQ for the Supply of MFTL or equivalent brand make 450mm x 1160mm Long Dredge Suction Hose for IWAI Dredger CSD ID-IV at Rupnarayan River NW-86 & IWAI/KOL/MM/49/2025-26/CSD ID-IV
NIQ for the Supply of MFTL or equivalent brand make 500mm x 1600mm Long Slurry Suction Hose for IWAI Dredger CSD Sweta at MMT Haldia & IWAIKo-150MN1/01/2020/CSD Sweta
RE-TENDER FOR TRANSPROTATION OF 300 MTRS DREDGER PIPELINE OF CSD SHIPRA FROM MMT HALDIA TO PANDU PORT GUWAHATI FOR THE YEAR 2025-26
DRY DOCK REPAIR OF 3 NOS IWAI VESSELS NAMELY AD NARMADA, WB GULMOHAR AND WB KERRIA FOR THE YEAR 2025-26 & IWAI/KO-150MN14/1/2025-26
RE-TENDER FOR TRANSPROTATION OF 300 MTRS DREDGER PIPELINE OF CSD SHIPRA FROM MMT HALDIA TO PANDU PORT GUWAHATI FOR THE YEAR 2025-26 & IWAI/KOL/MM/108/2020-21/CSD Shipra
RETENDER FOR TRANSPROTATION OF 300 MTRS DREDGER PIPELINE OF CSD SHIPRA FROM MMT HALDIA TO PANDU PORT GUWAHATI FOR THE YEAR 2024-25 & IWAI/KOL/MM/108/2020-21/CSD Shipra
SUPPLY OF ONE NO MECHANIZED COUNTRY BOAT ON DAILY BASIS IN TENTULIA FOR PROVIDING DAY TO DAY ASSISTANCE (24 X 7 BASIS ) TO IWAI, AMPHIBIAN DREDGER FALGU FROM TENTULIA TO KALANCHI INICHAMATI RIVER(NW-44) FROM APRIL’25 TO MARCH’26 & IWAI/KOL/NW-44 /M/COUNTRY BOAT/2025-26
Supply of hired mobile floating inspection outpost at Hemnagar and allied places in National Waterway No:-97 (Sunderban Waterway) by deployment of self propelled wooded launch & IWAI/KOL/HEMNAGAR/HIREDLAUNCH/2025-26
TENDER FOR DRY DOCK REPAIR OF IWAI PONTOON FJB- III FOR THE YEAR 2024-25 & IWAI/KOL/MM/76/FJB-III/2023-24
RETENDER FOR DRY DOCK REPAIR OF IWAI PONTOON FJ GANGA - X FOR THE YEAR 2024-25 & IWAI/KOL/MM/76/FJG-X/2023-24
DRY DOCK REPAIR OF IWAI PONTOON FJB- III FOR THE YEAR 2024-25 & IWAI/KOL/MM/76/FJB-III/2023-24
Construction, repair & renovation of road at BTPS jetty & IWAI/KOL/8/TERMINAL/BTPS JETTY
NIQ for Supply of Anchor, Stud Link Anchor Chain with Swivel adapter and Kenter/Joining Shackle for IWAI vessel DB Ajay & IWAI/Ko-150MN29/1,2,3/2021
Supply and Installation of spares of Harbour DG of IWAI Vessel S.L Koel
Painting and Repair works of IWAI vessel MV Beki
Painting and Repair works of IWAI vessel MV Beki
NIQ for Supply of Mechanized Country Boat at Haldia Dredging Site for providing day to day assistance (24x7 basis) to CSD Sweta & IWAIKo-150MN1/01/2020/CSD Sweta
NIQ for Supply of Mechanized Country Boat at Haldia Dredging Site for providing day to day assistance (24x7 basis) to CSD Sweta & IWAIKo-150MN1/01/2020/CSD Sweta
NIQ for Supply of MFTL or equivalent brand make 500mm x 1600 mm Long Slurry Suction Hose for IWAI Dredger CSD Sweta at MMT Haldia & IWAIko-150MN1/01/2020/CSD Sweta
NIQ for Supply of MFTL or equivalent brand make 450mm x 1160mm Long Dredge Suction Hose for IWAI Dredger CSD ID-IV at Rupnarayan
NIQ for Transportation of Floating Pipe and Dredging Pipeline from Farakka to G.R. Jetty, Kolkata & IWAI/KOL/MM/NC/27/Vol-II/2020-21
Providing Vessel-Husbanding Services and related activities etc to IWAI vessels in India-Bangladesh PIWTT Riverine Routes
Supply of Anchor, Stud Link Anchor Chain with Swivel Adapter and Kenter/Joining Shackle & IWAI?Ko-150MN29/1,2,3/2021
RE-TENDER FOR DRY DOCK REPAIR OF 3 NOS IWAI PONTOONS NAMELY FJ GANGA -I, FJ GANGA- IX, FJ GANGA - X FOR THE YEAR 2024-25 & IWAIKo-150MN14/1/2024-25
DRY DOCK REPAIR OF IWAI PONTOON CP GANGA-I FOR THE YEAR 2024-25 & IWAI/Ko-150MN40/1/2024-25