Supply of Vessel Crew Under Schedule-A and Dredging Unit (Crews) Schedule-B for the period from January 2022 to March 2022 from Kahalgaon to Prayagraj stretch of National Waterway No.1 (River Ganga)
Repairing & Painting Work at NINI, Gaighat, Patna. & IWAI/NINI/Building/2021-22
Dry ?Dock repair of TUG S.C. Bose for F.Y 2021-22 & ref.no 12-IWAI/ENGG/P (96)/2015-16
Dry –Dock repair of TUG S.C. Bose for F.Y 2021-22 & ref.no 12-IWAI/ENGG/P (96)/2015-16
Afloat repair of WB Orchid for F.Y 2021-22 ref. no 12-IWAI/ENGG/P (150)/2019-20
Afloat repair of WB Lily for F.Y 2021-22 ref. no 12-IWAI/ENGG/P (03)/2019-20
AMC FOR OPERATION & MAINTENANCE OF SWIMMING POOL AT NINI FOR THE PERIOD JANUARY-2022 TO DECEMBER-2022
Providing of Vehicle's at IWAI, Varanasi on monthly basis.
Dry Dock repair of CSD Mahananda for F.Y.2021-22 in NW-1 and Ref:12-IWAI/ENGG/P (94)/2021-22
Providing of Vehicle's at IWAI, Varanasi on monthly basis.