Construction of pile & slab bank protection from Thykoodam bridge to eastern boundary of RO, Kochi in Champakara Canal of NW-3 and IWAI/COCH/36(5)A/2021-22/15
Dry-Docking Repair Works of WB Jamanthy at Yard In Kochi During The Year 2021-22.and IWAI/COCH/MM(66)/2021-22/13
Repair and Maintenance of Kayamkulam IWT Terminal at Ayiramthengu in NW.3. IWAI/COCH/36(9)A/2021-22/12
Construction of Rip – Rap type bank protection in various locations of Cheriyazheekkal area in Kayamkulam – Edappallikkotta stretch of NW.3 and IWAI/COCH/33(3)/2021-22/11
Repair & Maintenance of Kayamkulam IWT Terminal at Ayiramthengu in NW.3 and IWAI/COCH/36(9)A/2021-22/06
Dry Docking Reapir Works of AD Manimala at Yard in Kochi During the Year 2021-22 & IWAI/COCH/MM(46B)/2021-22/10
Construction of Rip – Rap type bank protection in various locations in Champakara & Udyogmandal canals of NW.3 and IWAI/COCH/33(5)B/2021-22/09
Supply of Self-propelled Hopper barge on Hire Basis for Transportation of Dredged Materials in Waterways Under Kochi Regional office & IWAI / COCH / MM (46D) / 2021-22 / 07
Dredging at Koramkotta in Udyogmandal of National Waterway.3 Kerala using backhoe dredger
Construction of bank protection behind passenger jetty at Kollam terminal in NW.3 and IWAI/COCH/36(11)A/2021-22/08