Maintenance & safekeeping of community jetty at Sharma Babu Ghat, Tribeni from November 2023 to March 2024 & IWAI/KOL/8/MM/29/CJ(SBG)/2023-24
Construction of temporary store room at roof top and repair & renovation of miscellanous works under the premises of IWAI, Kolkata & IWAI/KOL/8/MISC/2023-24
Re-Tender for Dry Dock and essential repair of 2 nos vessels namely MV AAI and MV BEKI for the year 2023-24 & IWAI/Kol-150MN/14/1/2023
Re-tender for Dry dock repair of 03 nos. IWAI vessels namely CP Ganga II, FJ Ganga IX and SL Dihang for the year 2023-24 & IWAI/Kol-150MN/14/1/2023
IWAI/KOL/8/Sahibganj/2023-24 & Providing Barbed wire fencing, gates and security huts at MMT Sahibganj 2023-24
Supply of two nos. mechanized country boat including manpower on hire basis for safety & security of the Existing Navigation Lock at Farakka for 6 months i.e. October 2023 to March 2024. & IWAI/KOL/MM/E-E-356199 FNL Boat Hire
Annual afloat repair of IWAI vessel MV Zakir Hussain for the year 2023-24 & IWAIKO-150MN4/1/2020
Painting and repairing of 8 nos. IWAI Pontoons namely F.J BRAHMAPUTRA –V, F.J GANGA –I, F.J BRAHMAPUTRA –VI, F.J BRAHMAPUTRA – VII, F.J GANGA –XIX, F.J GANGA -XX , F.J GANGA –XXI, CP GANGA –III for the year 2023-24 & IWAI/Kol-150MN/14/1/2023
IWAI/KOL/8/Functions/2023-24 & Arrangement of functions of IWAI projects
IWAI/KOL/8/WORK/KOLAGHAT/2023-24 & Miscellaneous work at IWT Terminal,Kolaghat in 2023-24
Dry dock repair of IWAI vessel SL Dihang for the year 2023-24 & IWAI/KOL/150/MN/44/1/2022
Construction of 20m x 05m x 2.4m size bamboo dykes for withholding dredge spoil of IWAI Amphibian Dredger A.D Falgu in Tentulia-Kalanchi stretch of NW-44.
Annual afloat repair of 2 nos. IWAI vessel namely CSD Sweta and CSD Shipra for the year 2023-24 & IWAI/Kol-150MN/14/1/2023/
Construction of 3 nos of mooring pins & replacement of wooden plank of walkway at BTPS jetty, Tribeni & IWAI/KOL/8/BTPS Jetty/2023-24
ANNUAL AFLOAT REPAIR OF 02 NOS IWAI VESSELS NAMELY SL GANGA AND MV HOMI BHABHA FOR THE YEAR 2023-24 & IWAIKO-150MN38/1/2021
DRY DOCK REPAIR OF 03 NOS IWAI VESSELS NAMELY HPT RANI LAXMI BAI, MPT MANGAL PANDEY AND SL KOEL FOR THE YEAR 2023-24 & IWAI/Kol-150MN/14/1/2023
Supply of a mechanized country boat in Tentulia (Chainage 40 km) to Kalanchi (63.38 km) of National Waterways No.44
Dry dock repair of 02 nos. IWAI Pontoons namely CP Ganga-II and FJ Ganga –IX for the year 2023-24 & IWAI/Kol-150MN/14/1/2023
Construction of 2 nos. mooring pins at Haldia Terminal Jetty no.3
PROCUREMENT & SUPPLY OF 2 NM NAVIGATIONAL LED LIGHTS (SOLAR OPERATED) DURING 2023-24 & IWAI/KOL/NA/NW-86/2023-24
Engagement of skilled Crew for operation, safety and maintenance of vessels of IWAI as per defined scope for a period of 8 monthsfor N.W.-01 (Kolkata-Kahalgaon) and Protocol Route
Repairing /fully servicing of one no. 10KVA Ashok Leyland make (Model AL 485 G1 Engine No.,50315350) DG set at Hemnagar integrated office complex, Dist-24pgs(N), West Bengal
Nit for Supply, erection and O&M of navigational lighted posts, snag/ caution marks with retro reflective sticker & project sign board along NW-86 in 2023-24 & IWAI/KOL/8/Nav aids/Kolaghat/2023-24
Engagement of a hydraulic excavator (Proclaimer) for preparation of dumping area at Farakka
Providing mooring facilities at Botanical Garden jetty & IWAI/KOL/8/Terminal/BG/2023-24
Supply of a mechanised country boat at D/s Jangipur Barrage for clearing of water hyacinth/under water weeds etc.IWAI/KOL/JANGIPUR LOCK/2021-22
Supply of necessary unskilled workmen for cleaning of water hyacinth/underwater weeds from D/s Jangipur Barrage channel. IWAI/KOL/JANGIPUR LOCK/2021-22
Repair & maintenance of dredging reputed industrial repairer/contractor for repair & maintenance of dredging pipe line for CSD Jalangi dredging unit at Haldia
Construction of 2 nos. Mooring Pins at Haldia terminals Jetty no. 3
Repair & laying of dredging pipe line from dredging point to disposal area for CSD Sweta dredging unit deployed at Haldia
NIQ for Repairing / Engine & overhauling charging services of one no 15KVA escort make DG at Hemnagar integrated office complex, Dist-24pgs(N), West Bengal
Construction of dyke for disposal of dredged materials at Haldia terminal & IWAI/Kol/8/Terminal/2023-24
SUPPLY OF HIRED MOBILE FLOATING INSPECTION OUTPOST AT HEMNAGARAND ALLIED PLACES IN NATIONAL WATERWAY NO:-97 ( SUNDERBAN WATERWAY) BY DEPLOYMENT OF SELF PROPELLED WOODEN LAUNCH FROM APRIL’23 TO MARCH’24
One Time Removal/cleaning of Water hyacinth & IWAI/KOL/SUR/NW-44(ICHAMATI)/2022-23
SUPPLY OF ELECTRICAL ITEMS/SPARES FOR ELECTRICAL SYSTEM AT FARAKKA & 358328/Nav. Lock/23-24
Providing Barbed wire fencing alongwith one number of ms gate at Kolaghat terminal during 2022-23 & IWAI/KOL/8/TERMINAL/KOLAGHAT/2022-23
Execution of maintenance works at RIS stations at Swaroopganj & IWAI/KOL/SUR-RIS(Maint.)/Swaroopganj/2022-23
Execution of maintenance works at RIS stations at Haldia & IWAI/KOL/SUR-RIS(Maint.)/Haldia/2022-23
Execution of maintenance works at RIS stations at Tribeni & IWAI/KOL/SUR-RIS(Maint.)/Tribeni/2022-23
REPAIR OF 3NO. IWAI MODULAR PONTOON FOR THE YEAR 22-23 & IWAI/Kol/MM/76/2022-23
Bank protection works at Kolaghat terminal of IWAI during 2022-23 & IWAI/KOL/8/TERMINAL/KOLAGHAT/BP/2022-23
One Time Removal/cleaning of Water hyacinth, Weeds, wastes including plastic and non-plastic materials, natural and artificial (dumped materials) from Tentulia (Ch. 40 Km to Kalanchi(Ch.63.81 Km) in the stretch of Ichamati River (NW-44) during 2022-23 & IWAI/KOL/SUR/NW-44(ICHAMATI)/2022-23
Construction of Temporary Bank Protection Works for a length of 9.0 m for retaining earth at IWAI's Kolaghat IWT Jetty, River Rupnarayan, NW-86, District: Purba Medinipur, West Bengal & IWAI/KOL/8/Terminal/Kolaghat/2022-23
Repairing of one number dual frequency Bathy Echosounder and Transducer as per terms & conditions given below. The instrument pertains to IWAI Sub Office Swaroopganj, Dist- Nadia, West Bengal and the address of sub office Swaroopganj office
Erection of two mooring pins at Bateswarsthan & IWAI/Kol/8/Scheme/2022-23/NIQ-1
Supply of 2 nm navigational led lights (solar operated) during 2022-23. & IWAI/KOL/NW-97/RCW/2022-23
Construction of Temporary Bank Protection Works for a length of 9.0 m for retaining earth at IWAI's Kolaghat IWT Jetty, River Rupnarayan, NW-86, District: Purba Medinipur, West Bengal & IWAI/KOL/8/Terminal/Kolaghat/2022-23
DRY DOCK REPAIR OF SL ANUPALLAV FOR THE YEAR 2022-23 & IWAI/KOL/150/MM/41/1/2022
ANNUAL AFLOAT REPAIR OF CSD SHIPRA FOR THE YEAR 2022-23 & IWAI/KOL/MM/108/2020-21/CSD SHIPRA/01
NOTICE FOR PROPOSALS/BUDGETARY OFFERS FOR REPAIRING OF BULKHEAD GATES & RADIAL GATES OF EXISTING NAVIGATION LOCK AT FARAKKA