Development of navigational channel by quantity based dredging between Nayaghat - Guptarghat stretch of National Waterway no-40 (River Ghaghra) for F.Y -2024-25 & F.Y- 2025-26
Annual/Afloat repair of dredgers namely CSD Yamuna, CSD Jalangi, CSD Tizu, CSD Mahananda and CSD Kallada at NW-I for the F.Y.2024-25
Work for dismantling of existing office setup, shifting and setting up the same at new premises of IWAI Varanasi Sub office
Annual/Afloat repair of accommodation boats namely AB Kailash and HB Chandradinga at NW-I for the F.Y.2024-25
Work for dismantling of existing office setup, shifting and setting up the same at new premises of IWAI Varanasi Sub office
Dry-docking repair of FJ Ganga-III in NW-1 for the F.Y. 2024-25
Dry-docking repair of FJ Ganga-II in NW-1 for the F.Y. 2024-25
Fabrication and Supply of Dredging Pipelines for Cutter Suction Dredger Mahananda for the Year 2024-25 at IWT Gaighat, Patna.
Annual/Afloat repair of vessels namely SL Gandak, SL Ghaghara, SL Jahanavi, SL Mandakini, SL Rihand and Barge Bahak-25 at NW-I for the F.Y.2024-25.
Development of navigational channel by quantity based dredging between Nayaghat - Guptarghat stretch of National Waterway no -40 (River Ghaghra) for F.Y- 2024-25 & F.Y- 2025-26